Project Delivery Method Performance for Public School Construction: Design-Bid-Build versus CM at Risk
Auteur(s): |
Noel Carpenter
Dennis C. Bausman |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, octobre 2016, n. 10, v. 142 |
Page(s): | 05016009 |
DOI: | 10.1061/(asce)co.1943-7862.0001155 |
- Informations
sur cette fiche - Reference-ID
10170543 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018