Prediction of Ground Subsidence Caused by Shield Tunnel Construction Under Hidden Karst Cave
Auteur(s): |
Jiashu Zhang
Mingyang Xu Minghua Cui Yue Xin Haitao Wang Peng Su |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Geotechnical and Geological Engineering, mars 2022, n. 7, v. 40 |
Page(s): | 3839-3850 |
DOI: | 10.1007/s10706-022-02136-3 |
- Informations
sur cette fiche - Reference-ID
10673809 - Publié(e) le:
29.05.2022 - Modifié(e) le:
17.06.2022