Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract
Auteur(s): |
Jesus M. De La Garza
Apirath Prateapusanond Nikhil Ambani |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, novembre 2007, n. 11, v. 133 |
Page(s): | 836-845 |
DOI: | 10.1061/(asce)0733-9364(2007)133:11(836) |
- Informations
sur cette fiche - Reference-ID
10162762 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018