A Practical Decision-Making Framework for Extension of Time Claims Associated with Force Majeure Events
Auteur(s): |
Seng Hansen
Susy F. Rostiyanti Wellie Tjahyadi |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, novembre 2022, n. 4, v. 14 |
DOI: | 10.1061/(asce)la.1943-4170.0000567 |
- Informations
sur cette fiche - Reference-ID
10693697 - Publié(e) le:
23.09.2022 - Modifié(e) le:
23.09.2022