PPP project price mode typologies: a China-based comparative case study
Auteur(s): |
Yubo Guo
Jinchan Liu Chuan Chen Xiaowei Luo Igor Martek |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, mars 2024, n. 5, v. 31 |
Page(s): | 2034-2052 |
DOI: | 10.1108/ecam-10-2023-1032 |
- Informations
sur cette fiche - Reference-ID
10775319 - Publié(e) le:
29.04.2024 - Modifié(e) le:
12.05.2024