POMDP and MOMDP solutions for structural life-cycle cost minimization under partial and mixed observability
Auteur(s): |
Konstantinos G. Papakonstantinou
Charalampos P. Andriotis Masanobu Shinozuka |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Structure and Infrastructure Engineering, mai 2018, n. 7, v. 14 |
Page(s): | 869-882 |
DOI: | 10.1080/15732479.2018.1439973 |
- Informations
sur cette fiche - Reference-ID
10142112 - Publié(e) le:
01.12.2018 - Modifié(e) le:
01.12.2018