Planning municipal drainage infrastructure maintenance operations with finite available crews: pragmatic optimization approach
Auteur(s): |
Ali Bayesteh
Ming Lu Prasanna Lakshminarasimhan |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Civil Engineering and Management, 17 septembre 2024, n. 8, v. 30 |
Page(s): | 708-719 |
DOI: | 10.3846/jcem.2024.21744 |
- Informations
sur cette fiche - Reference-ID
10805066 - Publié(e) le:
10.11.2024 - Modifié(e) le:
10.11.2024