Piece by piece
A fast and inexpensive erection procedure was used for the construction of a new arch bridge in Kazakhstan
Médium: | article de revue |
---|---|
Langue(s): | anglais |
Publié dans: | Bridge Design & Engineering, 1er trimestre 2009, n. 54, v. 15 |
Page(s): | 38 |