Performance validation and manufacture feasibility for an advanced constructive system considering facilities integration
Auteur(s): |
Carlos Rivera-Gómez
José Pérez-Fenoy José A. Entrenas-Angulo Martín López-Aguilar Carmen Galán-Marín |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Building Engineering, mai 2020, v. 29 |
Page(s): | 101127 |
DOI: | 10.1016/j.jobe.2019.101127 |
- Informations
sur cette fiche - Reference-ID
10407818 - Publié(e) le:
04.01.2020 - Modifié(e) le:
04.01.2020