Performance of Design-Build Projects in terms of Cost, Quality and Time: Views of Clients, Architects and Contractors in Singapore
Auteur(s): |
Florence Ling
Edwin Leong |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Australasian Journal of Construction Economics and Building, novembre 2002, n. 1, v. 2 |
Page(s): | 37-46 |
DOI: | 10.5130/ajceb.v2i1.2885 |
Abstrait: |
One of the major problems in the construction industry is that of fragmentation. This hasled to an increased adoption of design-build (DB) as a procurement route in recent years.This move attempts to solve problems associated with the use of the traditional designbid-build method.The performance of DB projects is investigated under three aspects, namely quality, timeand cost. Results of the opinion survey concluded that contractors, architects and clientsagreed that DB projects perform well in these three areas. This confirms the inherent advantagesthat DB has to offer. It is concluded that DB is indeed a worthwhile procurementroute but the various participants must understand its structure and accept the changesinvolved. |
Lieux géographiques
- Informations
sur cette fiche - Reference-ID
10338786 - Publié(e) le:
05.08.2019 - Modifié(e) le:
05.08.2019