Performance of a deep top-down zoned pit-in-pit excavation close to existing metro lines through winter
Auteur(s): |
Wenxin Cao
Pengjiao Jia Pengpeng Ni Wen Zhao Cheng Cheng Fei Wang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Frontiers of Structural and Civil Engineering, septembre 2024, n. 11, v. 18 |
Page(s): | 1680-1697 |
DOI: | 10.1007/s11709-024-1122-y |
- Informations
sur cette fiche - Reference-ID
10803149 - Publié(e) le:
10.11.2024 - Modifié(e) le:
17.01.2025