Pasternak Model-Based Tunnel Segment Uplift Model of Subway Shield Tunnel during Construction
Auteur(s): |
Xiang-Ling Tao
Yun-He Su Qi-Yin Zhu Wen-Long Wang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Advances in Civil Engineering, janvier 2021, v. 2021 |
Page(s): | 1-10 |
DOI: | 10.1155/2021/8587602 |
Abstrait: |
Segment uplift is a frequent problem during the construction of shield tunnels. The phenomenon of segment uplift in Xuzhou Metro Line 1 is investigated. The segment uplift magnitude in the shale layer is quite smaller than that in the clay layer. A tunnel segment uplift calculation model based on the Pasternak foundation beam model is proposed, which considers the hardening process of the grouted body with time. The finite difference method is adopted to calculate the magnitude of segment uplift during different tunnel construction stages, and a numerical solution of segment uplift on the longitudinal direction is obtained. The applicability of the numerical solution is studied by comparing with the field test results and parametric analyses are also performed to investigate the effects of different factors on segment uplifting. The results show that the coefficient of subgrade modulus, shear stiffness of the shear layer, and grout pressure all influence the segment uplifting of the tunnel. The influence of the coefficient of subgrade modulus and grout pressure on segment uplift is more significant. |
Copyright: | © Xiang-Ling Tao et al. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
1.3 MB
- Informations
sur cette fiche - Reference-ID
10630641 - Publié(e) le:
01.10.2021 - Modifié(e) le:
17.02.2022