Owners’ Perspective of Factors Contributing to Project Delay: Case Studies of Road and Bridge Projects in Saudi Arabia
Auteur(s): |
Ghazi Saad A. Elawi
Mohammed Algahtany Dean Kashiwagi |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Procedia Engineering, 2016, v. 145 |
Page(s): | 1402-1409 |
DOI: | 10.1016/j.proeng.2016.04.176 |
- Informations
sur cette fiche - Reference-ID
10669663 - Publié(e) le:
03.06.2022 - Modifié(e) le:
03.06.2022