Organizational Readiness for Building Information Modeling Implementation in Malawi: Awareness and Competence
Auteur(s): |
Melusi Ndwandwe
Witness Kuotcha Theresa Mkandawire |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Buildings, 23 juillet 2024, n. 8, v. 14 |
Page(s): | 2279 |
DOI: | 10.3390/buildings14082279 |
Abstrait: |
In developed countries, the government primarily supports the adoption of BIM. However, adoption is typically driven by the preferences of industry professionals among construction organizations in developing countries, who rely on their BIM awareness and competence. Thus, BIM competence and awareness have become an important indicator of organizational BIM readiness. To assess the level of BIM readiness, this study aims to determine the BIM competence and awareness levels among Malawian construction organizations. The study surveyed 189 construction professionals and analyzed the data using descriptive statistics and reliability tests. The findings revealed that there is a moderate level of BIM awareness among the organizations. The organizations have BIM-capable software. However, the professionals within these organizations possess a limited proficiency in BIM technical abilities, particularly in performing BIM-related services and executing BIM-related tasks. Therefore, construction organizations in Malawi should prepare for the widespread adoption of BIM by addressing the insufficient technical skills and limited awareness of BIM among their workforce. Furthermore, the study indicates that engaging in collaborative efforts could serve as a valuable foundation for the adoption of BIM within construction organizations. |
Copyright: | © 2024 by the authors; licensee MDPI, Basel, Switzerland. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
1.39 MB
- Informations
sur cette fiche - Reference-ID
10795007 - Publié(e) le:
01.09.2024 - Modifié(e) le:
01.09.2024