Optimizing time, cost and quality in multi-mode resource-constrained project scheduling
Auteur(s): |
Marimuthu Kannimuthu
Benny Raphael Ekambaram Palaneeswaran Ananthanarayanan Kuppuswamy |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Built Environment Project and Asset Management, mars 2019, n. 1, v. 9 |
Page(s): | 44-63 |
DOI: | 10.1108/bepam-04-2018-0075 |
- Informations
sur cette fiche - Reference-ID
10367265 - Publié(e) le:
27.08.2019 - Modifié(e) le:
27.08.2019