Optimizing Sequential Excavation Method for Ground Settlement Control in Tehran Subway Tunnel Line 6
Auteur(s): |
Meysam Aghajari
Ali Naghi Dehghan Seyed Hamid Lajevardi |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Geotechnical and Geological Engineering, janvier 2024, n. 5, v. 42 |
Page(s): | 3595-3614 |
DOI: | 10.1007/s10706-024-02747-y |
- Informations
sur cette fiche - Reference-ID
10776843 - Publié(e) le:
- Modifié(e) le:
20.09.2024