Abstrait:

In order to simplify the completion process of cable force optimization and adjustment in long-span concrete-filled steel tube arch bridges, a new method was proposed in the present study. To this end, a reasonable completion cable force calculation method was proposed based on the influence matrix principle of cable force optimization. Then combined with the mechanical characteristics of concrete-filled steel tube arch bridge, the weighted matrix was introduced to simplify the influence matrix of cable force and optimize the suspender cable force. The performed comparative study showed that the maximum difference of single cable force between the measured and calculated values is less than 5%, and the calculation error satisfies the requirements of the specification. It is concluded that the proposed method can accurately control the suspender tension construction in the arch bridge, optimize the cable force of long-span concrete filled-steel tube arch bridge, and realize the comparison and selection of various optimization schemes. The research results have been successfully applied to the suspender force adjustment of Third Pingnan Bridge, which greatly simplifies the adjustment steps and the total cable force difference in the whole bridge is 1.37%, the difference between the measured and designed suspender tensions of Heshan Hongshui River Bridge at completion state is less than 2%. The successful application of this method effectively saves the labor and material cost of suspender adjustment and further enhances the superiority of steel tube concrete arch bridge. The proposed method is expected to be an excellent choice to monitor constructions, adjust the bridge completion stage, and provide a reference for the suspender tension construction control of similar bridges.

Copyright: © 2022 Kaizhong Xie et al.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10657350
  • Publié(e) le:
    17.02.2022
  • Modifié(e) le:
    01.06.2022
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine