Optimization of construction parameters of Highway Tunnel CRD Method
Auteur(s): |
Wang yuwen
Hua kaicheng Li Ke Guo Hongyan Cui Xiangyang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | IOP Conference Series: Materials Science and Engineering, 1 janvier 2020, n. 1, v. 741 |
Page(s): | 012091 |
DOI: | 10.1088/1757-899x/741/1/012091 |
Abstrait: |
For shallow buried tunnels with poor surrounding rock stability, reasonable construction parameters are of great significance for ensuring tunnel construction safety and controlling construction quality. Taking Huiqing a tunnel as an example, comprehensive analysis of the partition wall R=11.6 ∠ 520, R=5.76 ∠1060, R=5.46 ∠1040, R=+∞∠1800 three different radii of curvature, using FLAC software for four calculations Numerical simulation of working conditions, analysis of plastic zone changes and surrounding rock deformation under different calculation conditions, and the radius of curvature of this project is proposed. The research results show that the middle partition wall adopts R=5.76 and the central angle=1060 can ensure the stability of surrounding rock and the minimum deformation of surrounding rock, which can provide a certain reference for the construction of such highway tunnels. |
- Informations
sur cette fiche - Reference-ID
10675329 - Publié(e) le:
03.06.2022 - Modifié(e) le:
03.06.2022