Optimisation of Construction Process Inspection Rates using a Learning Approach
Auteur(s): |
Swapan Saha
Colin Greville Trevor Mullins |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Australasian Journal of Construction Economics and Building, novembre 2001, n. 2, v. 1 |
Page(s): | 1-13 |
DOI: | 10.5130/ajceb.v1i2.2871 |
Abstrait: |
In the construction industry, the determination of the number of inspections/tests to be performed for a repetitive task is an important issue. The quality of a completed task depends on a number of factors including the cost of inspection, the cost of failure, the average proportion defective (error rate) and the inspection rate. To achieve a higher quality level, 100% inspection can be performed, however, this is unlikely to be cost effective. To determine the optimum inspection rate, this paper suggests a probabilistic approach incorporating the acceptance-sampling plan and minimum cost method. The limitation of various sampling plans including the attribute proportional sampling plan and the double sampling plan are outlined. An example is presented in this paper to demonstrate the calculation of the optimum number of inspections/tests per lot. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
0.23 MB
- Informations
sur cette fiche - Reference-ID
10338792 - Publié(e) le:
05.08.2019 - Modifié(e) le:
02.06.2021