Optimisation of Cantilever Based Energy Harvester Design for Railway Bridges

Auteur(s): (Escuela Técnica Superior de Ingeniería Universidad de Sevilla Camino de los Descubrimientos s/n ES‐41092 Sevilla Spain)
(Escuela Técnica Superior de Ingeniería Universidad de Sevilla Camino de los Descubrimientos s/n ES‐41092 Sevilla Spain)
(Escuela Técnica Superior de Ingeniería Universidad de Sevilla Camino de los Descubrimientos s/n ES‐41092 Sevilla Spain)
(Universitat Jaume I, Department of Mechanical Engineering and Construction Avda. Sos Baynat s/n ES‐12071 Castell'on Spain)
(Universitat Jaume I, Department of Mechanical Engineering and Construction Avda. Sos Baynat s/n ES‐12071 Castell'on Spain)
Médium: article de revue
Langue(s): anglais
Publié dans: ce/papers, , n. 5, v. 6
Page(s): 399-406
DOI: 10.1002/cepa.2070
Abstrait:

In this paper, the authors investigate energy harvesting on railway bridges. A tuning process based on a statistical analysis of the mechanical energy generated by a lumped‐mass model is presented and validated. A cantilever‐based energy harvester configuration is applied, and the optimal design of 3D printed energy harvesters is studied. The electromechanical behaviour of the device is represented by an analytical model for the estimation of the energy harvested from train‐induced bridge vibrations. A genetic algorithm constrained to geometry and structural integrity is used to solve the optimisation problem. The design flexibility and energy performance are maximised by 3D printing of the substructure of the harvester. An optimal device prototype with PAHT CF15 substructure is designed and manufactured for a real bridge in the Madrid‐Sevilla High‐Speed line. The prototype is experimentally validated under laboratory conditions. Finally, the performance of energy harvesting is evaluated from in situ experimental data measured by the authors. The results allow quantifying the energy harvested in a time window of five hours and twenty‐seven train passages.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1002/cepa.2070.
  • Informations
    sur cette fiche
  • Reference-ID
    10767276
  • Publié(e) le:
    17.04.2024
  • Modifié(e) le:
    17.04.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine