0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

An Ontology-Based Cost Estimation for Offsite Construction

Auteur(s):




Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Information Technology in Construction, , v. 28
Page(s): 220-245
DOI: 10.36680/j.itcon.2023.011
Abstrait:

Design for manufacturing and assembly (DfMA) has been widely applied to support the decision-making process in offsite construction. With a DfMA approach, cost estimation requires taking product design and production processes into consideration. Current studies conduct cost estimation built upon quantity take-offs. However, they do not provide a vocabulary to relate cost estimates to offsite construction processes. This paper presents a new domain ontology, Offsite Housing Ontology (OHO) using the NeOn methodology framework to support cost estimation considering products, resources, and production processes. OHO semantically defines offsite construction domain terminology and relationships. This supports a unified model, required for efficient collaborative design management. The efficiency and effectiveness of the OHO approach are demonstrated in a real-world DfMA scenario through the development of a Knowledge-Based Engineering tool to automate cost estimation. The approach can be adapted and extended to accommodate a very wide range of offsite housing, delivering important optimization and automation benefit from DfMA solutions.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.36680/j.itcon.2023.011.
  • Informations
    sur cette fiche
  • Reference-ID
    10730544
  • Publié(e) le:
    30.05.2023
  • Modifié(e) le:
    30.05.2023
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine