Numerical Investigation of Gob-Side Entry Retaining through Precut Overhanging Hard Roof to Control Rockburst
Auteur(s): |
Xiaoming Sun
Li Gan Zhao Chengwei Tang Jianquan He Manchao Song Peng Miao Chengyu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Advances in Civil Engineering, 2018, v. 2018 |
Page(s): | 1-10 |
DOI: | 10.1155/2018/8685427 |
Abstrait: |
Gob-side entry retaining through precut overhanging hard roof (GERPOHR) method is one of the commonly used methods for nonpillar mining. However, feasibility studies of controlling rockburst by this method are few. Rockburst occurs in hard thick strata with a higher probability, larger scale, and higher risk. To better understand the GERPOHR method is beneficial for rockburst mitigation. In this paper, the design of GERPOHR was first introduced. And the layout of the working face was optimized. Then, based on the numerical simulation, the stress and displacement distribution characteristics were compared under the condition of conventional mining and GERPOHR method. The research shows that the intervals of main roof weighting could be decreased through the precut overhanging hard roof method. And the peak value of abutment pressure decreased. Meanwhile, the energy accumulation and the stress fluctuation could be alleviated in roadway surrounding rock. |
Copyright: | © 2018 Xiaoming Sun et al. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
5.29 MB
- Informations
sur cette fiche - Reference-ID
10236477 - Publié(e) le:
11.12.2018 - Modifié(e) le:
02.06.2021