A new ventilation system for extra-long railway tunnel construction by using the air cabin relay: A case study on optimization of air cabin parameters length
Auteur(s): |
Yuchun Tao
Hui Hu Heng Zhang Gang Zhang Zihan Hao Lu Wang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Building Engineering, janvier 2022, v. 45 |
Page(s): | 103480 |
DOI: | 10.1016/j.jobe.2021.103480 |
- Informations
sur cette fiche - Reference-ID
10637811 - Publié(e) le:
30.11.2021 - Modifié(e) le:
30.11.2021