Multiple-project discount rates for cost-benefit analysis in construction projects: a formal risk model for microgeneration renewable energy technologies
Auteur(s): |
Jacopo Torriti
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Construction Management and Economics, septembre 2012, n. 9, v. 30 |
Page(s): | 739-747 |
DOI: | 10.1080/01446193.2012.692165 |
- Informations
sur cette fiche - Reference-ID
10206879 - Publié(e) le:
05.12.2018 - Modifié(e) le:
05.12.2018