Multiparameter Inversion Early Warning System of Tunnel Stress-Seepage Coupling Based on IA-BP Algorithm
Auteur(s): |
Junxiang Wang
Jie Sun Haijun Kou Yaxian Lin |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Advances in Civil Engineering, janvier 2021, v. 2021 |
Page(s): | 1-19 |
DOI: | 10.1155/2021/1566693 |
Abstrait: |
Under construction disturbance, the surrounding rock of a soft rock tunnel shows obvious aging characteristics. The creep characteristics of a rock mass under stress-seepage coupling greatly influence the long-term stability of a project. How to simply, quickly, and accurately determine the creep parameters of a rock mass under coupling conditions is significant to engineering structure design and construction. The optimal weights and thresholds of the BP neural network are sought through the immune algorithm to avoid the problem of slow convergence speed of the BP neural network and easy to fall into local optimum. Therefore, an intelligent back analysis method based on the IA-BP algorithm is established, which leads to the development of the corresponding intelligent back analysis program. The creep effect of the rock mass was simulated herein using the Drucker–Prager yield criterion and the time hardening creep law as the forward optimization method constitutive model. In addition, a sensitivity analysis of the parameters was performed to determine the optimal number of inversion parameters. By comparing and analyzing the residual between the inversion results of the IA-BP algorithm, PSO-BP algorithm, and the test values, the high precision of the IA-BP algorithm is proved. Taking the Lan Zhou-Hai Kou national expressway tunnel as an engineering example, a multiparameter creep inversion of the tunnel surrounding rock under the stress-seepage coupling condition was conducted using the inverse analysis method of the IA-BP algorithm. The results showed that the proposed IA-BP algorithm can effectively prevent the BP neural network from falling into a local minimum. Also, the algorithm is fast and accurate. The intelligent back analysis method based on the IA-BP algorithm is applied to the multifield coupling parameter back analysis, provides the basis and help for the structural design and construction of soft rock tunnel in water-rich stratum. |
Copyright: | © 2021 Junxiang Wang et al. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
5.23 MB
- Informations
sur cette fiche - Reference-ID
10625361 - Publié(e) le:
26.08.2021 - Modifié(e) le:
17.02.2022