Moving toward lean construction through automation of planning and control in last planner system: A systematic literature review
Auteur(s): |
Ajay Kumar Agrawal
Yang Zou Long Chen Mohammed Adel Abdelmegid Vicente A. González |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Developments in the Built Environment, avril 2024, v. 18 |
Page(s): | 100419 |
DOI: | 10.1016/j.dibe.2024.100419 |
- Informations
sur cette fiche - Reference-ID
10775968 - Publié(e) le:
29.04.2024 - Modifié(e) le:
29.04.2024