Modified Streamlined Optimization Algorithm for Time–Cost Tradeoff Problems of Complex Large-Scale Construction Projects
Auteur(s): |
Jia Wang
Congji Han Xinghua Li |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, mai 2023, n. 5, v. 149 |
DOI: | 10.1061/jcemd4.coeng-12970 |
- Informations
sur cette fiche - Reference-ID
10708272 - Publié(e) le:
21.03.2023 - Modifié(e) le:
21.03.2023