0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

The Modifications of the stress-state of cable-stayed bridges due to staggered construction of their superstructure

Auteur(s):


ORCID
Médium: article de revue
Langue(s): anglais
Publié dans: The Baltic Journal of Road and Bridge Engineering, , n. 4, v. 9
Page(s): 241-250
DOI: 10.3846/bjrbe.2014.30
Abstrait:

In current practice, the effects of the evolutionary erection of cable-stayed bridge superstructure are rarely included into the simulation of its tensioning process. In fact, stay forces in service are usually defined in early stages of design, when the construction process has not even been conceived in detail yet. In order to fill this gap, the effects of the evolutionary erection of cable-stayed bridge superstructure throughout the tensioning process are studied in this paper. This study is focused on steel cable-stayed bridges erected on temporary supports. For the very first time a new criterion to include the effects of the evolutionary erection of cable-stayed bridges into the definition of the stay forces in the service state is presented.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.3846/bjrbe.2014.30.
  • Informations
    sur cette fiche
  • Reference-ID
    10084705
  • Publié(e) le:
    09.10.2018
  • Modifié(e) le:
    09.10.2018
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine