Modernising a monument: The challenges of strengthening and widening a structurally deficient road bridge under live traffic
Auteur(s): |
Mark Treacy
(B+S AG, Consulting Engineers and Planners Zürich Switzerland)
Frank Jokisch (B+S AG, Consulting Engineers and Planners Bern Switzerland) Eugen Brühwiler (Swiss Federal Institute of Technology (EPFL) Lausanne Switzerland) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | ce/papers, septembre 2023, n. 5, v. 6 |
Page(s): | 135-144 |
DOI: | 10.1002/cepa.2035 |
- Informations
sur cette fiche - Reference-ID
10767025 - Publié(e) le:
17.04.2024 - Modifié(e) le:
17.04.2024