응결시간조정에 의한 매트기초 매스 콘크리트의 온도균열저감 공법적용의 Mock-up Test (Mock-up Test of Temperature Crack Reduction Method Application by Setting Time Control of Mat Foundation Mass Concrete)
Auteur(s): |
Cheon-Goo Han
Jae-Sam Lee Sang-Kyun Noh |
---|---|
Médium: | article de revue |
Langue(s): | coréen |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), août 2009, n. 4, v. 9 |
Page(s): | 55-61 |
DOI: | 10.5345/jkic.2009.9.4.055 |
- Informations
sur cette fiche - Reference-ID
10762042 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024