Mobile crane selection in project logistics operations using Best and Worst Method (BWM) and fuzzy Measurement of Alternatives and Ranking according to COmpromise Solution (MARCOS)
Auteur(s): |
Ömer Faruk Görçün
Gürkan Doğan |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, mars 2023, v. 147 |
Page(s): | 104729 |
DOI: | 10.1016/j.autcon.2022.104729 |
- Informations
sur cette fiche - Reference-ID
10710763 - Publié(e) le:
21.03.2023 - Modifié(e) le:
21.03.2023