A Method For Determine The Groups Of The Road Sections To Be Simultaneously Constructed And The Priority Between These Groups Considering The Disutility Under Construction
Auteur(s): |
Masaru Kiyota
(THE JAPAN SOCIETY OF CIVIL ENGINEERS)
Hiroshi Tanoue (THE JAPAN SOCIETY OF CIVIL ENGINEERS) Tomonori Sumi (THE JAPAN SOCIETY OF CIVIL ENGINEERS) Chikashi Deguchi (THE JAPAN SOCIETY OF CIVIL ENGINEERS) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | 土木学会論文集 (Doboku Gakkai rombunshū), 1994, n. 494, v. 1994 |
Page(s): | 63-70 |
DOI: | 10.2208/jscej.1994.494_63 |
- Informations
sur cette fiche - Reference-ID
10617982 - Publié(e) le:
24.08.2021 - Modifié(e) le:
24.08.2021