0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Membrane Bioreactor Process Modeling and Optimization: Ulu Pandan Water Reclamation Plant

Auteur(s): (Assistant Professor, School of Civil and Environmental Engineering, Nanyang Technological Univ., Singapore 639798 (corresponding author).)
(Professor, School of Civil and Environmental Engineering, Nanyang Technological Univ., Singapore 639798.)
(Research Fellow, School of Civil and Environmental Engineering, Nanyang Technological Univ., Singapore 639798.)
(Engineer, DHI-NTU Research Center and Education Hub, Nanyang Technological Univ., Singapore 639798.)
(Engineer, DHI-NTU Research Center and Education Hub, Nanyang Technological Univ., Singapore 639798.)
(Engineer, DHI-NTU Research Center and Education Hub, Nanyang Technological Univ., Singapore 639798.)
(DHI Denmark, Horsholm, Denmark 2970.)
Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Environmental Engineering (ASCE), , n. 12, v. 138
Page(s): 1218-1226
DOI: 10.1061/(asce)ee.1943-7870.0000581
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1061/(asce)ee.1943-7870.0000581.
  • Informations
    sur cette fiche
  • Reference-ID
    10585304
  • Publié(e) le:
    08.03.2021
  • Modifié(e) le:
    08.03.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine