Managing Cost Risks in Oil and Gas Construction Projects: Root Causes of Cost Overruns
Auteur(s): |
Iraj Esmaeili
Hamed Kashani |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, mars 2022, n. 1, v. 8 |
DOI: | 10.1061/ajrua6.0001193 |
- Informations
sur cette fiche - Reference-ID
10640588 - Publié(e) le:
29.11.2021 - Modifié(e) le:
29.11.2021