Abstrait: |
Public–private partnerships (PPPs) are contractual schemes that have relative success in Latin America due to their configuration, where the spirit of the contract lies in an appropriate distribution of risks. This is both the most important and fundamental aspect of this contractual scheme but also the most complex, as it is the main cause of contract modifications (addenda) in countries across the region. In this context, different concessionary contractual frameworks for PPPs on the national road network of Peru were evaluated, revealing common failure indicators that lead to contract modifications within the first six years of the concession. This study offers the development of a management model that includes the good practices of contractual management of NEC4 Option F and the application of BIM information management processes, optimizing the management of infrastructure through emerging technologies of information management supported by agile contractual schemes. |
Copyright: | © 2024 by the authors; licensee MDPI, Basel, Switzerland. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |