Maintenance Scheduling for Railway Tracks under Limited Possession Time
Auteur(s): |
Cuong Dao
(Postdoctoral Researcher, Dept. of Construction Management and Engineering, Univ. of Twente, P.O. Box 217, Enschede 7500 AE, Netherlands (corresponding author))
Rob Basten (Associate Professor, Dept. of Industrial Engineering and Innovation Sciences, Eindhoven Univ. of Technology, P.O. Box 513, Eindhoven 5600 MB, Netherlands.) Andreas Hartmann (Associate Professor, Dept. of Construction Management and Engineering, Univ. of Twente, P.O. Box 217, Enschede 7500 AE, Netherlands.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Transportation Engineering, Part A: Systems, août 2018, n. 8, v. 144 |
Page(s): | 04018039 |
DOI: | 10.1061/jtepbs.0000163 |
- Informations
sur cette fiche - Reference-ID
10580253 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021