The Bath-Woolwich Bridge in Maine will have the longest precast balanced cantilever concrete segmental span in America—128 m (420 ft)—when completed. It carries U.S. Route 1 over the Kennebec River between the city of Bath and the town of Woolwich. The bridge is scheduled for completion in July 2000. The bridge designed by the design-build team has a total length of 906 m, with 12 spans at lengths of 56-56-56-80-128-116-101-101-62-50-50-50 m. The 56- and 50-m end spans are cast-in-place concrete box girders. The center spans are precast concrete segmental erected in balanced cantilever. The two-cell box girder superstructure segments vary in depth from 6 m at the piers to 2.8 m at midspan. The Maine Department of Transportation developed a unique procedure to select a design-build team for this project, which included prequalifying four design-build teams to submit proposals; scoring of technical proposals by a diverse group of 19 individuals; and combining scores with price by dividing the price by the score, with the lowest price per score point winning. The Maine Department of Transportation’s design-build selection process assured Maine of the best value for this important project.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.3141/1696-46.
  • Informations
    sur cette fiche
  • Reference-ID
    10778449
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine