Maine Builds Longest-Span Precast Segmental Bridge with Unique Design-Build Selection Process
Auteur(s): |
Alan R. Phipps
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Transportation Research Record: Journal of the Transportation Research Board, janvier 2000, n. 1, v. 1696 |
Page(s): | 71-75 |
DOI: | 10.3141/1696-46 |
Abstrait: |
The Bath-Woolwich Bridge in Maine will have the longest precast balanced cantilever concrete segmental span in America—128 m (420 ft)—when completed. It carries U.S. Route 1 over the Kennebec River between the city of Bath and the town of Woolwich. The bridge is scheduled for completion in July 2000. The bridge designed by the design-build team has a total length of 906 m, with 12 spans at lengths of 56-56-56-80-128-116-101-101-62-50-50-50 m. The 56- and 50-m end spans are cast-in-place concrete box girders. The center spans are precast concrete segmental erected in balanced cantilever. The two-cell box girder superstructure segments vary in depth from 6 m at the piers to 2.8 m at midspan. The Maine Department of Transportation developed a unique procedure to select a design-build team for this project, which included prequalifying four design-build teams to submit proposals; scoring of technical proposals by a diverse group of 19 individuals; and combining scores with price by dividing the price by the score, with the lowest price per score point winning. The Maine Department of Transportation’s design-build selection process assured Maine of the best value for this important project. |
- Informations
sur cette fiche - Reference-ID
10778449 - Publié(e) le:
12.05.2024 - Modifié(e) le:
12.05.2024