Machine learning-aided engineering services' cost overruns prediction in high-rise residential building projects: Application of random forest regression
Auteur(s): |
Shahab Shoar
Nicholas Chileshe John David Edwards |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Building Engineering, juin 2022, v. 50 |
Page(s): | 104102 |
DOI: | 10.1016/j.jobe.2022.104102 |
- Informations
sur cette fiche - Reference-ID
10655778 - Publié(e) le:
17.02.2022 - Modifié(e) le:
21.02.2022