0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Linking employee empowerment with productivity in off-site construction

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Engineering, Construction and Architectural Management, , n. 1, v. 22
Page(s): 21-37
DOI: 10.1108/ecam-09-2013-0083
Abstrait:

Purpose

The purpose of this paper is to address current knowledge gaps in off-site sub-element fabrication efficiency factors, by identifying an explicit relationship between productivity and employee empowerment.

Design/methodology/approach

The research is based on two engineering fabrication-yard case studies that investigate both qualitatively (via analysis of semi-structured interviews that incorporate a five-point Likert scale, with fabrication-product stakeholders), and also quantitatively (via assessment using SPSS statistical analyses to determine significance and trends in the data-set) the relationship between empowerment and productivity.

Findings

The results reveal a positive linear relationship in off-site construction between “employee empowerment factors” and, explicitly fabrication-yard “productivity-levels”. An especially strong and significant positive correlation is found to exist in resource development, worker involvement, process improvement, and task recognition as they refer to off-site construction productivity.

Practical implications

Most academic studies of off-site construction remain largely anecdotal and lack an empirical objective study; as a result, this (fabrication-yard) case-study research provides a useful approach to measure empirically the link between employee empowerment and productivity of off-site construction.

Originality/value

Employee empowerment in the construction industry has long been a focus of analyses; however, there remains a lack of consensus and very few studies into the direct relationship between employee empowerment on the one-hand, and productivity in off-site construction on the other-hand. It is argued here that the on-going new research undertaken in the present study will go beyond subjective opinion towards objective measurement of actual performance in off-site construction.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1108/ecam-09-2013-0083.
  • Informations
    sur cette fiche
  • Reference-ID
    10576457
  • Publié(e) le:
    26.02.2021
  • Modifié(e) le:
    26.02.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine