Life cycle cost analysis on three high-performance glazing systems for an office building in New Cairo, Egypt
Auteur(s): |
Youssef O. Elkhayat
Mona G. Ibrahim Koji Tokimatsu Ahmed AbdelMonteleb M. Ali |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Architectural Engineering and Design Management, octobre 2020, n. 1-2, v. 17 |
Page(s): | 1-15 |
DOI: | 10.1080/17452007.2020.1788500 |
- Informations
sur cette fiche - Reference-ID
10428385 - Publié(e) le:
30.07.2020 - Modifié(e) le:
11.04.2021