Lean Construction Implementation in the Saudi Arabian Construction Industry

Auteur(s):



Médium: article de revue
Langue(s): anglais
Publié dans: Construction Economics and Building, , n. 1, v. 17
Page(s): 46-69
DOI: 10.5130/ajceb.v17i1.5098
Abstrait:

The Kingdom of Saudi Arabia (KSA) has witnessed a huge increase in construction during the last two decades. However, many projects experienced time delays, cost overruns and the generation of massive amounts of waste. To address these challenges, lean construction has been introduced into the Saudi construction industry; however, it is still in its infancy. This study therefore investigates the current state of lean construction implementation in the construction industry in the KSA. The objectives are to identify: the types of construction waste, level of use of tools that support the implementation of lean construction, stages of application of lean methods, and the benefits of lean construction. To achieve these objectives, a structured questionnaire survey of 282 construction professionals was carried out. After the analysis of the collected data using mean score and Anova test, the following conclusions were made.  In the construction industry in the KSA, waiting is the most common type of waste, while Computer Aided Design (CAD) is the conventional tool supporting the implementation of lean construction. Furthermore, the data suggests that lean construction is most commonly used in the construction stage of projects while customer satisfaction is the main benefit derived from lean construction practices. This study concludes that the level of implementation of lean construction in the KSA construction industry is increasing. The results will help benchmark the current state of lean construction implementation, which will enable the construction industry to identify strategies to implement lean construction in Saudi Arabia in accordance with their needs and project goals, to achieve better productivity.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.5130/ajceb.v17i1.5098.
  • Informations
    sur cette fiche
  • Reference-ID
    10338519
  • Publié(e) le:
    05.08.2019
  • Modifié(e) le:
    05.08.2019
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine