The Last Planner System as an Emergent Production Planning and Control Method: The Role of Multiple Representations
Auteur(s): |
Douglas Comassetto Hamerski
Tarcisio Abreu Saurin Carlos T. Formoso Eduardo Luis Isatto |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, novembre 2024, n. 11, v. 150 |
DOI: | 10.1061/jcemd4.coeng-14743 |
- Informations
sur cette fiche - Reference-ID
10791267 - Publié(e) le:
01.09.2024 - Modifié(e) le:
01.09.2024