Labor Shortage and Safety Issues in Postearthquake Building Construction: Case Study
Auteur(s): |
Krishna P. Kisi
K. Joseph Shrestha Rujan Kayastha (Operation Manager, GreenTech Pvt. Ltd., Ward No. 2, Byasi, Bhaktapur 44800, Nepal.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, août 2020, n. 3, v. 12 |
Page(s): | 05020011 |
DOI: | 10.1061/(asce)la.1943-4170.0000386 |
- Informations
sur cette fiche - Reference-ID
10580032 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021