Knowledge extraction for solving resource-constrained project scheduling problem through decision tree
Auteur(s): |
Lin-Lin Xie
Yajiao Chen Sisi Wu Rui-dong Chang Yilong Han |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, avril 2023, n. 7, v. 31 |
Page(s): | 2852-2877 |
DOI: | 10.1108/ecam-04-2022-0345 |
- Informations
sur cette fiche - Reference-ID
10714436 - Publié(e) le:
21.03.2023 - Modifié(e) le:
20.09.2024