0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Key Blasting Parameters for Deep-Hole Excavation in an Underground Tunnel of Phosphorite Mine

Auteur(s):




Médium: article de revue
Langue(s): anglais
Publié dans: Advances in Civil Engineering, , v. 2019
Page(s): 1-9
DOI: 10.1155/2019/4924382
Abstrait:

Ever increasing mine production capacity and mechanized operations enable advanced drilling equipment to be widely adopted in underground mines. In order to achieve satisfactory blasting performance in tunnel advance, there is a critical need to optimize the blasting technique to match the large deep-hole drilling capability. In this study, through theoretical analysis of tunnel blasting, the layout of cutting holes was found to be the key factor controlling the blasting performance. The deep-hole cutting effect was first investigated by analyzing the influence of the free surface of a hollow hole using the fluid-structure interaction modeling method in ANSYS/LS-DYNA. Then the rock dynamic evolution processes of blasting using a double-cavity grooving and a four-cavity grooving were compared and analyzed towards an understanding of the influence of the spacing and layout of cutting holes on the blasting performance. The comparison results show that four empty hole cut layouts yield larger effective free surface than that of the two empty hole cut layouts. This is because larger compensation space for breaking of rock and expansion of gas is more conducive to improving the energy utilization rate of explosives and thus improving the blasting performance and the footage of cyclic blasting. The results indicated that the blasting performance can be improved by reserving reasonable compensation space in the grooving area.

Copyright: © 2019 Xiu-wei Chai et al.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10400197
  • Publié(e) le:
    12.12.2019
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine