Investigation on the tail brush induced loads upon segmental lining of a shield tunnel with small overburden
Auteur(s): |
Guan-lin Ye
Lei Han Santosh Kumar Yadav Xiao-hua Bao Chen-cong Liao |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Tunnelling and Underground Space Technology, mars 2020, v. 97 |
Page(s): | 103283 |
DOI: | 10.1016/j.tust.2020.103283 |
- Informations
sur cette fiche - Reference-ID
10409203 - Publié(e) le:
10.01.2020 - Modifié(e) le:
10.01.2020