Investigation of the Reasonable Time Computation under Time-at-Large Construction Schedule Disputes
Auteur(s): |
Mohamed-Asem U. Abdul-Malak
Reem K. Mehdi (Formerly, Graduate Student, Dept. of Civil and Environmental Engineering, Maroun Semaan Faculty of Engineering and Architecture, American Univ. of Beirut, Bechtel Engineering Bldg., Beirut 1107 2020, Lebanon.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, février 2020, n. 1, v. 12 |
Page(s): | 04519042 |
DOI: | 10.1061/(asce)la.1943-4170.0000351 |
- Informations
sur cette fiche - Reference-ID
10579968 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021