Intelligent Forecast Model for Project Cost in Guangdong Province Based on GA-BP Neural Network

Auteur(s):





Médium: article de revue
Langue(s): anglais
Publié dans: Buildings, , n. 11, v. 14
Page(s): 3668
DOI: 10.3390/buildings14113668
Abstrait:

Project cost forecasting is a complex and critical process, and it is of paramount importance for the successful implementation of engineering projects. Accurately forecasting project costs can help project managers and relevant decision-makers make informed decisions, thereby avoiding unnecessary cost overruns and time delays. Furthermore, accurately forecasting project costs can make important contributions to better controlling engineering costs, optimizing resource allocation, and reducing project risks. To establish a high-precision cost forecasting model for construction projects in Guangdong Province, based on case data of construction projects in Guangdong Province, this paper first uses the Analytic Hierarchy Process (AHP) to obtain the characteristic parameters that affect project costs. Then, a neural network training and testing dataset is constructed, and a genetic algorithm (GA) is used to optimize the initial weights and biases of the neural network. The GA-BP neural network is used to establish a cost forecasting model for construction projects in Guangdong Province. Finally, by using parameter sensitivity analysis theory, the importance of the characteristic values that affect the project cost is ranked, and the optimal direction for controlling the project cost is obtained. The results showed: (1) The determination coefficient between the forecasting and actual values of the project cost forecasting model based on the BP neural network testing set is 0.87. After GA optimization, the determination coefficient between the forecasting and actual values of the GA-BP neural network testing set is 0.94. The accuracy of the intelligent forecast model for construction project cost in Guangdong Province has been significantly improved after optimization through GA. (2) Based on sensitivity analysis of neural network parameters, the most significant factor affecting the cost of construction projects in Guangdong Province is the number of above-ground floors, followed by the main structure type, foundation structure, above-ground building area, total building area, underground building area, fortification intensity, and building height. The results of parameter sensitivity analysis indicate the direction for cost control in construction projects. The research results of this paper provide theoretical guidance for cost control in construction projects.

Copyright: © 2024 by the authors; licensee MDPI, Basel, Switzerland.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10810380
  • Publié(e) le:
    17.01.2025
  • Modifié(e) le:
    17.01.2025
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine