Integration of Probabilistic Effectiveness with a Two-stage Genetic Algorithm Methodology to Develop Optimum Maintenance Strategies for Bridges

Auteur(s):


Médium: article de revue
Langue(s): anglais
Publié dans: The Open Construction and Building Technology Journal, , n. 1, v. 9
Page(s): 266-276
DOI: 10.2174/1874836801509010266
Abstrait:

Preventative Maintenance (PM) measures can be used to postpone/delay the initiation of corrosion from chloride attack in reinforced concrete bridges. However there are a lot of uncertainties that influence their degree of effectiveness. Also the time-application of these measures can raise a conflict between safety requirements and budgets. This paper presents a stochastic approach for estimating the effectiveness of different PM measures. Additionally a two-stage optimisation methodology using the principles of Genetic Algorithms (GA) is developed to address the problem of the timeapplication by linking the effectiveness with the cost to produce optimum PM strategies. Futhermore, the role of the presented time-dependent probabilistic approach in the proposed two-stage GA methodology for obtaining optimum PM strategies is demonstrated.

Copyright: © 2015 Elia A. Tantele, Renos A. Votsis, Toula Onoufriou
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10381316
  • Publié(e) le:
    22.11.2019
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine