Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM
Auteur(s): |
Kyungki Kim
Yong Cho Sijie Zhang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, octobre 2016, v. 70 |
Page(s): | 128-142 |
DOI: | 10.1016/j.autcon.2016.06.012 |
- Informations
sur cette fiche - Reference-ID
10190797 - Publié(e) le:
10.12.2018 - Modifié(e) le:
10.12.2018